The following is a list of some of the projects STI has performed.
El Sorbante Landfill, Corona, CA.
Performed PPT investigation and installed 3 Push-in Steel collectors.
Palos Verdes Landfill, Rolling Hills, CA.
Perform 3-D Profile and installed 6 Push-in steel collectors.
LA Unified School District, Los Angeles, CA
CPT investigation to outline sinkhole near school buildings.
Santiago Landfill, Orange County, CA.
Performed PPT investigation and installed 4 Push-in collectors
Installed 1Internal Conduit.
Olinda Alpha Landfill, Brea, CA.
Performed PPT investigation of two impacted perimeter probes.
Created a 3-D Profile.
Tajiguas Landfill, Santa Barbara, CA.
Performed 3-D Liquid and LFG Profile.
La Habra Landfill, La Habra, CA.
Performed PPT Profile and installed 3, ¾” diameter steel perimeter probes.
South Bay Drive-in Landfill, Carson, CA.
Performed PPT Profile near impacted perimeter probe.
Installed 4 Push-in collectors.
Echo Landfill, JPL/NASA, Barstow, CA.
Performed PPT investigation and installed 7 Push-in collectors.
Benton Crossing Landfill, Mono County, CA.
Performed PPT and Hydropunch investigation.
Installed 7 Push-in collectors in 2 phases
Bailard Landfill, Ventura, CA.
Performed PPT investigation to pre-qualify 18 drilled in collectors.
Tierra Rejada Landfill, Simi Valley, CA.
Performed PPT investigation to profile the existing cover soil.
Investigated migrating LFG and installed 31 Push-in collectors.
Miramar Landfill, San Diego, CA.
Performed steam injection pilot study for airspace recovery Bioreactor.
Keifer Landfill, Sacramento, CA
PPT investigation and installation of 4 push-in wells.
Poway Landfill, Poway, CA
PPT investigation for gas migration and profiling of liquid layers.
Miramar Landfill, San Diego, CA
PPT profile and conducted Steam Injection Pilot Study.
Hay Road Landfill, Vacaville, CA
Probe Integrity Test. PPT investigation for gas migration to 3 impacted probes.
Installed 10 LFG vents and returned landfill to compliance within 30 days.
Carson Marketplace LLC, Carson, CA
Performed PPT Profile and Hydropunch sampling.
Installed 6 gas-sampling probes on a 168 acre closed landfill.